SPECIAL DESEMBER 2010 :1. Jual Iron ore 60 up( Non crusher )FOB MV USD 75 kapasitas produksi -/+ 25.000 MT/35 Hari payment cash 5-4-1.Iron ore 61 up( crusher )FOB MV USD 80 kapasitas produksi -/+ 25.000 MT/35 Hari payment cash 5-4-1. 2.Batu Kalsel GCV 63-61 ready stock -/+ 40.000 MT di stock pile payment cash 5-4-1 FOB Tongkang Rp.585.000 PMT 3.Batu Kaltim GCV 63-61 ready stock -/+ 40.000 MT di stock pile payment cash 5-4-1 FOB Tongkang Rp.630.000 PMT.

Sabtu, 08 Mei 2010

GALERY 3

PORT OF BORNEO

kalimantan

KALIMANTAN / BORNEO ISLAND :
# BANJARMASIN, TABONEO # KOTA BARU# SEBUKU
# SEMBAKUNG# TANJUNG PEMANCINGAN# KETAPANG
# TANAH GROGOT# TARAKAN# TELUK SAMPIT
# MUARA SATUI# MUARA JAWA# MUARA BERAU
# TANJUNG REDEP# KUMAI, TELUK# PONTIANAK
# PALANGKARAYA# PANGKALAN BUN
# PULAU BUNYU# SAMARINDA# BONTANG
# BALIKPAPAN# BATU LICIN# NUNUKAN



INDONESIAN COAL LOADING PORT

1. ADANG BAY
Position : Panamax Vessel 01-42-00 South / 116-30 East – Draft more than 13 m
01-43-50 South / 116-26-10 East – Draft abt 12 m
01-42-50 South / 116-26-30 East – Draft abt 16 m
04-42-00 South / 116-26-30 East – Draft abt 22 m
Port Restriction: No restriction (open sea)

Pilot: Not compulsory
Loading Facility/Method : 1. By ship's Gear and Grabs
- Capacity 7 Cbm / 5 Pcs of shipper's Grabs
- Capacity 12 Cbm / 4 Pcs of shipper's Grabs
2. Loading by floating Crane for Gearless vessel's
Loading Rate : - Abt 10,000-12,000 MT/day (Ship's Gear)
- Abt 10,000-15,000 MT/day (Floating Crane)
Working Time : 24 hours/day, 7 days/week SHINC, Excluding National Major Holiday

2.APAR BAY (PETANGIS)
Position : Lat 02-00-00 South / Long 116-43-00 )Draft abt 16 m
Port Restriction : No Restriction (open sea)
Pilot : No Compulsory
Loading Facility/Method : By ship's Cranes and Floating Cranes 2 (Two) unit
- 6 (six) Units Tug Boat
- 5 (five) Barges With Capacity 7,000 MT/Unit
- Fresh Water and Bunker is not available
Loading Rate : By Floating Crane abt. 20,000 MT/Day
By ship's Crane abt. 5,000 – 7,000 MT
Working Rate : 14 hours/Day, 7days/week SHINC, excluding Nationality Major Holiday

3.BALIKPAPAN COAL TERMINAL
Position : Lat 01-21-00 South / Long 116-47-00 East
Pilot Boarding Position : Lat 01-21-20 South / Long 116-56-54 East
Meanwhile following are the update formula for calculating the sailing draft at Balikpapan Coal Terminal as follow:
13 M LWS + HIGH TIDE WATER
Loading Facilities : One Luffing Traveling Conveyor
Average loading rate : 1,750 MT/Hour
Port Restriction : - Maximum LOA : 250 Mtrs
- Maximum Beam : 43 Mtrs
- Maximum DWT : 90,000 MT
- Maximum Air Draft : 17 m
- Maximum Sailing Draft : 13 Mtrs + high tide (depen on high tide water)
Working Time : 24 hours/day, 7 days/week SHINC, Excluding National Major Holiday

4. BONTANG COAL TERMINAL
Terminal Position : Lat 00-00-01 South / Long 117-32-16 East
Anchor Position : 1. Lat 00-00-00 South / Long 117-35-02 East
2. Lat 00-00-02 South / Long 117-35-00 East
Pilot Boarding Ground : Lat 00-00-00 South / Long 117-35-00 East
Loading Facility : By Loader Quadrant Type (One Unit)
Loading Rate : About 1,700 – 2,000 MT/Hour
Working Time : 24 Hours/Day, 7 days/week SHINC, Excluding National Major Holidays
Berth Owner : PT. INDOMINCO MANDIRI

5. INDONESIAN BULK TERMINAL (SOUTH PULAU LAUT COAL TERMINAL)
Berth Position : Lat 04-02-00 South / Long 116-00-37 East
Anchor Position : Lat 04-02-00 South / Long 116-00-00 East / max depth 20m
Port Restriction : Max LOA : 230 m
Max Beam : 35 m
Max DWT : 80,000 tons
Loading Method : One Unit Starveling Conveyor
Working Time : 24 Hours/Day, 7days/week SHINC, Excluding Nationality Major Holiday

6. JORONG ANCHORAGE
Position : Lat 04-07-06 South / Long 115-04-05 East (Handy)
Lat 04-12-05 South / Long 115-05-09 East (Panamax)
Safe Draft Max : 16 m
Port Restriction : No Restriction (Open Sea)
Loading Method : By Ship's gear and using grabs from barges to ship's hold with loading
rate average 8,000 – 10,000 MT/Day
Working Hours : 24 Hours/Day, 7days/week SHINC, Excluding Nationality Major Holiday

7. MUARA PANTAI (BERAU ANCHORAGE)
Position : Lat 01-56-40 North / Long 118-07-20 East (21 m depth)
Lat 01-57-40 North / Long 118-05-30 East (17 m depth)
Port Restriction : No Restriction (Open Sea)
Pilot : No Compulsory
Loading Facility/Methods : 1. Loading by ship's Crane
2. Loading by SST (Semi Submersible Trans Shipper)
Loading Rate : - By Ship's Crane about 8,000 MT-10,000 MT/4 Gangs/Day
- By SST in average 12,000 MT-15,000 MT/Day
Working Hours : 24 Hours/Day, 7days/week SHINC, Excluding Nationality Major Holiday

8.NORTH PULAU LAUT COAL TERMINAL
Position : Lat 03-12-00 South / Long 116-18-10 East
Anchor Position : Lat 03-12-00 South / Long 118-19-00 East
Pilot Boarding at Anchorage : Lat 03-12-04 South / Long 116-19-06 East
Port Restriction : - Max Draft at Berth : 18 m
- Max Draft at Channel : 14 m + High tide
- Max Beam : 46 m
- Max LOA : 320 m
Loading Facility/Method : By Loader Conveyor
Loading Rate : 1,500 2,000 MT/Hours
Working Hours : 24 Hours/Day, 7days/week SHINC, Excluding Nationality Major Holiday

9. PADANG (TELUK BAYUR)
Position : Lat 01-00-04 South / Long 100-21-00 East
There are two kind of wharf usually use for loading coal at Padang, the both of them are follow :
CONVEYOR WHARFT Loading Rate : 9,000 - 10,000 MT/day
Restriction : Max Draft : 10.20 M - High Tide Water
Max LOA : 198 M
CONVENTIONAL WHARF
Restriction of Wharf No. 6 : Max Draft : 9.50 M - High Tide Water
Max LOA : 230 M
Loading Method : Use Ship Crane's by Bucket into ship Hold (usually the shipper provide the Bucket,
therefore it depend on their sales contract.
Loading Rate : 5,000 -8,000 MT/day
Working Hours : 24 Hours/Day, 7days/week SHINC, Excluding Nationality Major Holiday

10. RIAU, SUMATERA ISLAND
Loading Point : Muara Sungai Pakning
Position : Lat 00-24-00 North / Long 101-51-20 East (Depth about 13 meters)
Port Restriction : No Restriction (Open Sea)
Pilot Boarding : Morong Piot Station
Lat 01-54-12 North / Long 101-51-20 East
Steaming Time : Morong to Sungai Pakning : around 4 hours
Loading Method : By Ship Crane + Grabs
Loading Rate : About 5,000 - 8,000 MT/Day (Depend on Cargo Readiness)
Working Hours : 24 Hours/Day, Effective Working Hour 20 hrs

11. RIAU, SUMATERA ISLAND
Loading Point : Muara Bangkong
Position : Lat 00-24-00 North / Long 103-46-4 East
Depth about 18 M - 20 M
Restriction : Not any Restriction/Loading at anchorage
Port Restriction : No Restriction (Open Sea)
Stevedores Working Hours : 24 hrs, effective working hour 20 Hrs
Loading Method : By ship Crane + Grabs
Grabs : Vessel should be provide by own grabs
Loading Rate : About 7,000 - 8,000 MT/Day (Depend on Cargo Readiness)

12. SATUI ANCHORAGE
Position : Lat 03-58-00 South / Long 155-31-05 East (Max Draft 15 M)
Lat 03-56-00 South / Long 155-31-05 (Max Draft 12 M)
Port Restriction : No Restriction (Open Sea)
Loading Method : - Ship's Geared / Grab
- Ship's Geared / Shore Grabs
- Floating Cranes
Loading Rate : - 8,000 - 10,000 MT/Day approx (by Ship's geared/grabs)
- 7,000 - 9,000 MT/Day approx (by ship's geared/Shore Grabs)
- 12,000 MT/Day approx (by floating Cranes)

13. SEBUKU ANCHORAGE
Position : Lat 03-42-00 South / Long 116-24-00 East (Max Depth 18 M)
Lat 03-44-20 South / Long 116-23-50 East (Max Depth 20 M)
Lat 03-42-00 South / Long 116-24-00 East (Max Depth 12 M)
Port Restriction : No Restriction (Open Sea)
Loading Method : By Ship's Crane and Grabs
Loading Rate : 7,000 - 8,000 MT/Day
Working Hours : 24 Hour/day, 7 days/week SHINC excluding national major holiday

14. SAMARINDA ANCHORAGE
Loading Port : Muara Jawa
During Period December - June
Loading Position : Lat 00-59-30 South / Long 117-17-00 East (Handy)
Lat 01-02-01 South / Long 117-15-00 East (Panamax)
Pilot Boarding Ground : 01-05-00 South / 117-15-00 East
Loading Port : Muara Berau
During period June - December
Loading Position : Lat 00-15-00 South / Long 117-33-00 East (Handy)
Lat 00-14-06 South / Long 117-35-15 East (Panamax)
Port Restriction : No Restriction (Open Sea)
Loading Method : - By Ship Gear + Grabs/Shore Equipments
- By Shore Grabs and Floating Cranes
Loading Rate : - About 10,000 MT/Day by Ship Grabs and Floating Cranes
- About 6,000 - 8,000 MT by shore grabs

15. TABONEO (BANJARMASIN) ANCHORAGEPosition : - Handy Size : 03-04-00 South / 114-25-00 East
- Panamax : 03-40-30 South / 114-26-00 East
- Cape Size : 03-40-00 South / 114-25-00 East
Port Restriction: No Restriction (Open Sea)
Loading Method : - By Ship's Gear and Grabs
- By Floating Cranes and Grabs
Loading Rate : - 7,500 MT - 9,000 MT/Day by Ship's Gear and Grabs
- 10,000 MT - 15,000 MT /Day/One Floating Cranes
Working Hours : 24 Hour/day, 7 days/week SHINC excluding national major holiday

16. TANJUNG PEUTANG ANCHORAGE
Position : Lat 03-48-00 South / Long 115-59-00 East (max Draft 13 M)
Port Restriction : No Restriction (Open Sea)
Loading Rate : - 8,000 - 10,000 MT/Day approx (by Ship's geared/grabs)
Working Hours : 24 Hour/day, 7 days/week SHINC excluding national major holiday

17. TANJUNG PEMANCINGAN ANCHORAGE
Position : Lat 03-12-00 South / Long 11-21-40 East (max Draft 15 M-19 M)
Lat 03-12-04 South / Long 116-19.6 East (max Draft about 18 M)
Port Restriction : No Restriction (Open Sea)
Loading Rate : - 5,000 - 7,000 MT/Day (by Ship's geared/grabs)
- About 10,000 MT/Day by Floating Crane
Grabs : Most of the shipment provide by vessel Grabs
Working Hours : 24 Hour/day, 7 days/week SHINC excluding national major holiday

18. TANJUNG BARA COAL TERMINAL
Position : Lat 00-32' North / Long 117-39' East
Port Restriction : - Max Draft at
: 17,25 M + high tide - 0.75 UKC
- Max Beam : 50 M
- Max LOA : 300 M
- Max Air Draft : 22 M
Depth of Berth : 17.25 L.A.T
Loading Facility : 2 Ship's Loader
Average Loading Rate : 3,500 MT - 4,000 MT
Grabs : Most of the shipment provide by vessel Grabs
Working Hours : 24 Hour/day, 7 days/week SHINC excluding national major holiday

19. TANJUNG BARA ANCHORAGE
Name of Loading Port : Tanjung Bara, Lubuk Tutung
Name of Transhipper : FTS “BULK PIONER” (Moveable)
Position : Lat 00-32' North / Long 117-39-30 East
Lat 00-45 North / Long 117-47-00 East
Loading Method : 1. FTS (Floating Transfer Station)
2. Ship Cranes + Grab)
Port Restriction : No Restriction (Open Sea)
Loading Rate : 1. 15,000 MT - 20,000 MT/Day2. 10,000 MT - 12,000/Day
Working Hours : 24 Hour/day, 7 days/week SHINC excluding national major holiday